Research Repository of STIP

PENGARUH KETIDAKSESUAIAN JADWAL SIGN-OFF CREW TERHADAP KEPATUHAN IS PERJANJIAN KERJA LAUT (PKL) DI PT BSI MANAJEMEN INDONESIA

Show simple item record

dc.contributor.author NAJWAA HAFSARI, ELDHINI
dc.date.accessioned 2026-10-15T01:28:23Z
dc.date.available 2026-10-15T01:28:23Z
dc.date.issued 2025
dc.identifier.uri http://repository.stipjakarta.ac.id//handle/123456789/5685
dc.description.abstract This study aims to analyze the effect of crew sign-off schedule mismatch on compliance with the contents of the Seafarers’ Employment Agreement (SEA) at PT. BSI Manajemen Indonesia, as well as to identify the factors causing the mismatch in the schedule. The research used a quantitative method with data collection techniques through observation, documentation, and questionnaires distributed to 50 respondents. Data analysis was carried out using validity tests, reliability tests, correlation coefficient, coefficient of determination, simple linear regression, and hypothesis testing with the assistance of IBM SPSS Statistics. The results showed that all research instruments were valid and reliable. The correlation coefficient value of 0.917 indicates a very strong relationship between crew sign-off schedule mismatch and compliance with the SEA. The coefficient of determination (R Square) of 0.841 shows that 84.1% of SEA compliance is influenced by crew sign-off schedule mismatch, while 15.9% is influenced by other factors outside the study. The regression equation Y=7.078+0.843XY = 7.078 + 0.843XY=7.078+0.843X indicates a positive effect. The hypothesis test proved that crew sign-off schedule mismatch has a significant effect on compliance with the SEA. Therefore, the company needs to improve planning and management of crew rotation schedules to support SEA compliance and the smooth running of company operations. en_US
dc.publisher Sekolah Tinggi Ilmu Pelayaran en_US
dc.subject Schedule Mismatch, Crew Sign-Off, Seafarer Employment Agreement, Agreement Compliance, PT. BSI Manajemen Indonesia. en_US
dc.title PENGARUH KETIDAKSESUAIAN JADWAL SIGN-OFF CREW TERHADAP KEPATUHAN IS PERJANJIAN KERJA LAUT (PKL) DI PT BSI MANAJEMEN INDONESIA en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account