Research Repository of STIP

PENGARUH WAKTU TUNGGU DAN KARIER AWAK KAPAL TERHADAP KEBERLANJUTAN KONTRAK KERJA DI PT DEWI SRI MARITIM

Show simple item record

dc.contributor.author VERONICA SIMANULLANG, GABRIELLA
dc.date.accessioned 2026-10-14T03:19:49Z
dc.date.available 2026-10-14T03:19:49Z
dc.date.issued 2025
dc.identifier.uri http://repository.stipjakarta.ac.id//handle/123456789/5658
dc.description.abstract This study aims to analyze the influence of waiting-time and seafarers' career development on the continuity of employment contracts at PT Dewi Sri Maritim. The research employed a quantitative approach using a survey method involving 30 seafarers selected through purposive sampling. Data were collected through questionnaires and analyzed using multiple linear regression with the assistance of SPSS version 30. The results indicate that waiting-time has a significant effect on employment contract continuity, with a t-value of 56.921 and a significance level of less than 0.05. Seafarers' career development also has a significant effect on employment contract continuity, with a t-value of 5.655 and a significance level of less than 0.05. Simultaneously, both variables significantly affect employment contract continuity, with an F-value of 40.640 and a significance value of 0.000. The coefficient of determination (R2) of 0.751 indicates that 75.1% of the variation in employment contract continuity can be explained by waiting-time and seafarers' career development, while the remaining 24.9% is influenced by other factors outside the scope of this study. en_US
dc.publisher Sekolah Tinggi Ilmu Pelayaran en_US
dc.subject waiting-time, seafarers' career development, employment contract continuity. en_US
dc.title PENGARUH WAKTU TUNGGU DAN KARIER AWAK KAPAL TERHADAP KEBERLANJUTAN KONTRAK KERJA DI PT DEWI SRI MARITIM en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account